How far in advance should you plan a major home renovation?

  • Writer: SLETTEN CONTRACTING
    SLETTEN CONTRACTING
  • Oct 3
  • 2 min read

If you’re considering renovating your home—whether it’s a complete basement transformation, kitchen remodel, bathroom overhaul, or home addition—timing matters just as much as the budget.


Sletten Contracting

At Sletten Contracting Ltd., we often get asked: How early should we start planning our renovation? The answer? Sooner than you think. 


Why early planning matters in home renovations

Major home renovations are complex projects with numerous moving parts, including designs, permits, tradespeople, materials, and timelines. Without proper planning, costs can spiral out of control, schedules get delayed, and stress levels rise.


Here’s why savvy homeowners start planning 6 to 12 months:

  • Design work takes time – Finalizing your layout, selecting finishes, and aligning the project with your lifestyle and budget can take several weeks or months.

  • Permit approvals aren’t instant – Municipal permits in Saskatchewan can take anywhere from a few weeks to several months, depending on the scope of your project.

  • Trades get booked fast – Quality electricians, plumbers, and finishers are often booked months in advance.

  • Materials can be delayed – Items like windows, cabinetry, and flooring may have long lead times, especially if custom or imported.


Planning timeline for a successful renovation

Here’s a general timeline we recommend:

  • 6–12 months before: Define your project goals, budget, and wish list. Start interviewing renovation contractors.

  • 5–6 months before: Work with a designer or architect to finalize plans. Begin permit applications.

  • 3–4 months before: Confirm contractor selection, sign the agreement, and schedule your construction window.

  • 1–2 months before: Order long-lead materials and finalize all selections.

  • 1 month before: Prepare your space (declutter, move items, set up temporary living if needed).


By following this sequence, you’ll avoid last-minute decisions, rushed purchases, and scheduling conflicts that could derail your renovation.


What affects renovation timelines?

Each project is different, but here are a few key factors:

  • Scope and complexity of the renovation (structural changes, load-bearing walls, plumbing relocation, etc.)

  • Seasonal weather conditions (important for exterior work)

  • Material availability

  • Permit delays or zoning issues

  • Your decision-making speed (quick approvals = faster progress)


Why work with Sletten Contracting Ltd.?

Based in Saskatchewan, Sletten Contracting Ltd. specializes in custom home renovations that reflect your goals and respect your budget. Our team guides you from early planning to final finishes with:

  • Clear timelines and communication

  • A vetted network of skilled trades

  • Honest budgeting and transparent pricing

  • A passion for quality craftsmanship


We help you make smart renovation decisions—without pressure and without surprises.


Ready to start planning?

If you're considering renovating within the next 6 to 12 months, now is the ideal time to connect with us. The earlier we talk, the smoother your project will go.




 
 
SLETTEN.png
  • Instagram
  • Facebook
BBB-Logo-1.png

Transforming Spaces, Building Dreams

call-center.png

We're Here to Help

Have a specific question or need immediate assistance? Don't hesitate to call us directly at (306) 774-6251 or click here to get a free estimate.

© 2026 Sletten   All rights reserved.

bottom of page